| |
Your
builder will leave your site with a "rough grade". Hopefully
the site has been graded for drainage. This means that water is
going to run away from the house and garage rather than toward it.
This is generally the responsibility of the builder. We are happy
to help with major grading if your site needs it.
We take the grade the builder leaves and clean it up. We smooth
any high or low spots and fill in around any concrete surfaces like
sidewalks, patios, or driveways.
As
you can see in the pictures this site was fairly rough when we
started, but you'll see how we are able to take a rough grade
and turn it into an appealing landscape.
The
sprinkler system
is the next step. There's no need to fine grade or finish grade
the site before the sprinklers go in because one would need to
do it again afterward.
|